Project Name: Texas #3 Solidification Facility

Project Scope: New Build, Construction

Timeframe: Seven (7) months

Description: Cambridge worked with our customer to design a facility that could manage liquid in the most efficient way possible while also making sure it is in a safe environment. The footprint of the facility is 10,000 sq. ft. and they can process more than 2 million gallons of liquids at a time.

This facility has eight dumping areas so they can get customers in and out quickly. The excavator can work two pits simultaneously which is more efficient than making the track excavator move constantly. This facility was equipped with a roof and four open walls with a misting system to keep dust down. We also installed a wash down system so that the drivers had the ability to clean out the back of their trucks if there was residual solids remaining.

Solidification Facility Completed Construction

Previous
Next
Show more
Front View of Texas #3 Solidification Facility

Front View of Texas #3 Solidification Facility

Show more
Angle Front view of Texas #3 Solidification Facility

Angle Front view of Texas #3 Solidification Facility

Show more
Solidification Pit view of Texas #3 Solidification Facility

Solidification Pit view of Texas #3 Solidification Facility

Show more
Single Solidification Pit View at Texas #3 Solidification Facility

Single Solidification Pit View at Texas #3 Solidification Facility

Show more
Front View of Texas #3 Solidification Facility

Front View of Texas #3 Solidification Facility

Show more
Equipment at Texas #3 Solidification Facility

Equipment at Texas #3 Solidification Facility

Contact CambridgeContact us today to find out how we can help you with your next project!